Utility backlogs and interconnection delays don’t have to determine when your data center comes online. Dedicated on-site generation puts capacity in your hands while helping avoid community opposition tied to large-scale grid expansion.

What We Solve

Owning your power infrastructure puts your data center ahead of utility constraints. We design, build, and operate on-site generation systems sized for your demands.

Select a challenge to explore the issues facilities like yours face.

Challenge

Delayed Development

Securing utility power for a new data center can take years. By the time approvals come through, schedules have slipped and opportunities have moved on.

Solution

On-Site Power Generation

Unison Energy’s on-site distributed generation systems deliver dedicated power capacity directly to your facility, giving you control over your generation timeline.

Challenge

Grid Dependency

Relying on the grid alone leaves facilities exposed to outages, capacity constraints, and performance variability—putting uptime and operational continuity at risk.

Solution

Resilient, Private Power

Unison Energy delivers privately owned and operated on-site power systems that reduce reliance on the grid and give your facility greater control over its power supply. Systems can operate in parallel with the grid or independently, providing resilient, continuous power through a range of operating conditions.

Challenge

Scaling Brings Complexity

As data center power densities increase and facilities expand, delivering reliable, high-capacity power becomes more complex. Utility infrastructure often can’t keep pace, creating constraints around capacity, timelines, and system design.

Solution

Microgrids Built for Scale

Unison Energy develops, owns, and operates distributed generation systems designed to scale with your facility. With modular architecture and flexible configurations, we enable capacity growth without relying on utility upgrades or adding operational complexity.

The On-Site Generation Advantage

Power, built to scale

We deliver building blocks of power—when and where you need them. By owning and operating every system, we ensure reliable performance with 24/7 monitoring and dedicated in-house teams.

private-power_icon

Private Power, On Your Timeline

Avoid utiity delays and regulatory pushback. Bring capacity online when you need it.
system-uptime_icon

Guaranteed Uptime

Designed for mission-critical operations with redundant systems and performance-driven operations.
cost-savings_icon-1

Cost Certainty

Long-term agreements and onsite generation protect against volatile energy markets.

Our Process

Six phases. One long-term partner.

Learn More

Step 1: Initial Analysis

Understanding Your Energy Profile

We review your load forecasts and development schedule to align the right on-site power solution with your growth plans.

Step 2: Ground-Level Review

Assessing the Site

Our team conducts a detailed on-site assessment to evaluate infrastructure, space constraints, and integration requirements to provide you with a comprehensive Pro Forma.

 

*For larger industrial and data center clients, we perform a Front-End Loading (FEL2) Study that defines project scope, delivery model, phasing strategy, and financial structure before detailed engineering begins.

Step 3: ESA Contract

Locking in Your Project

We finalize design engineering, equipment specifications, pricing structure, and contract terms.

Step 4: Construction

Engineering Your System

We oversee engineering through construction, keeping your build on schedule and your team informed throughout.

Step 5: Commissioning

Testing and Optimization

We test the system under live conditions, confirm it meets performance targets, and finalize required approvals.

Step 6: Monitoring

Maintaining Long-Term Performance

Our technicians monitor performance 24/7, conduct preventive maintenance, and respond immediately to protect operational continuity.

Accelerate Time to Power
On-site generation puts power capacity in your hands. Let's find the right microgrid configuration for your data center and get your build moving.

FAQS

Have questions about data center private power?

Data center microgrids are typically delivered in modular phases averaging ~300 MW total program size, often commissioned in 100–200 MW blocks aligned with load ramp and expansion schedules.

Unison Energy is supported by Tiger Infrastructure Partners, an institutional infrastructure investor with approximately $3.9 billion in assets under management, providing scalable equity capital for large data center deployments.

Latest Resources

Insights shaped by over a decade of experience

From in-depth guides to real-world case studies, our resources give you the technical depth and context needed to make informed energy decisions.

Explore Resources

Other Capabilities

More ways we deliver power

Explore cogeneration for heat and power efficiency, microgrids for grid independence, and asset repowers for existing systems.