data-centers-hero_img-1 data-centers-hero_img-3 data-centers-hero_img-2 data-centers-hero_img-4

Clients We Serve

Data Centers

Power demands are outpacing the grid, but on-site generation gives data centers greater control over capacity, speed to power, costs, and continuity.

What We Solve

Data center energy challenges are intensifying on every front. We develop, own, and operate on-site power systems that address capacity constraints without compromise.

Select a challenge to explore the issues facilities like yours face.

Challenge

Grid Constraints & Capacity Limits

Demand for capacity and densification are driving growth, but utilities can’t keep pace, leaving data centers increasingly unable to secure the additional capacity they need, putting expansion plans at risk.

Solution

On-Site Generation, Delivered on Your Timeline

Unison Energy’s on-site distributed generation systems provide dispatchable, on-site power that can be deployed independent of utility upgrade timelines. Systems can be configured for grid-parallel or grid-independent operation, giving you the flexibility to scale capacity and maintain control over your power supply.

Challenge

Reliability & Uptime

Grid outages and peak demand periods pose significant threats to continuous operations. For data centers, any interruption risks SLA breaches that could lead to direct financial loss.

Solution

Resilient Power Designed Around Your Operating Strategy

Our systems can be configured for parallel operation with the grid, with seamless island mode capability, or for fully grid-independent operation. With built in spinning and maintenance reserves , the architecture is designed to deliver 99.9999%.

Challenge

Regulatory & Community Constraints

Data centers are increasingly exposed to regulatory uncertainty and growing community opposition. Dependence on grid expansion and utility infrastructure can trigger permitting delays, interconnection challenges, and public scrutiny that slow or stall projects.

Solution

Reduced Exposure Through Private Power

On-site, privately developed power reduces reliance on utility-led infrastructure, helping avoid regulatory delays and community opposition tied to grid expansion. With the ability to operate independently, Unison Energy systems give operators greater control, speed to deployment, and certainty over critical power delivery.

The On-Site Advantage

Performance, backed by ownership

97+% fleet-wide uptime doesn’t happen by accident. Our in-house technicians monitor, maintain, and optimize every system around the clock—because managing generation assets is all we do, so you can stay focused on your core business.

system-uptime_icon

System Uptime

Designed for mission-critical operations, with spinning and maintenance reserves and redundant electrical systems to ensure continuous power through disruptions.
plug_icon

Power on Your Timeline

Deploy on-site generation independent of utility upgrade cycles, enabling faster capacity delivery and reducing the risk of delayed energization.
sliders

Operational Control & Resilience

Operate grid-parallel or grid-independent, giving you greater control over your power supply and reducing reliance on constrained or unpredictable grid infrastructure.

Our Solutions

Demand more from your power

Our Process

Six phases. One long-term partner.

Learn more

Step 1: Initial Analysis

Understanding Your Energy Profile

We analyze utility costs, load forecasts, and cooling infrastructure to identify where on-site generation adds the most value.

Step 2: Ground-Level Review

Assessing the Site

Our engineers assess power density, available space, utility connections, and cooling integration opportunities such as chiller upgrades.

 

*For larger industrial and data center clients, we perform a Front-End Loading (FEL2) Study that defines project scope, delivery model, phasing strategy, and financial structure before detailed engineering begins.

Step 3: ESA Contract

Locking in Your Project

We finalize design engineering, pricing, and contract terms aligned with your uptime requirements and financial goals.

Step 4: Construction

Engineering Your System

We manage engineering, procurement, permitting, and construction while coordinating with your team to minimize disruption.

Step 5: Commissioning

Testing and Optimization

We commission and test the system under live load conditions, validate island mode performance, and secure all required permits.

Step 6: Monitoring

Maintaining Long-Term Performance

We conduct preventive maintenance and ensure industry-leading uptime year after year.

Accelerate Your Expansion

Avoid grid limits and reliability risk for your data center. On-site generation adds dedicated power, lowers costs, and supports growth—no upfront capital required.

FAQS

Have questions about data centers?

Initial phases are typically delivered in approximately 24 months from early development through commercial operation, with subsequent phases often moving faster once permitting, interconnection, and infrastructure are established.

Yes. Unison Energy is technology- and hardware-agnostic, designing bespoke microgrid solutions that balance performance targets, site constraints, utility/ISO compliance requirements, and long-term operational preferences.

Latest Resources

Insights shaped by over a decade of experience

From in-depth guides to real-world case studies, our resources give you the technical depth and context needed to make informed energy decisions.

Explore Resources